S.S. 106 Jonica Maxi Plot

1 2 3 4

The so-called “Maxi plot” is a mass of works concerning with the fulfillment of the SS106 motorway, from Squillace inter-change to Simeri Crichi interchange (more than 17 km), in-cluding the extension of the S.S. 280 motorway, from S. Si-nato interchange to Germaneto interchange (more than 5 km), in Corace valley.
The project at hand concerns with the works for the entrances of eleven double-barreled tunnels, developing along an un-derground path of 13,265 km.